أعمال الجبس والجبسم بورد بمكة

نقدم خدمات احترافية في تصميم وتنفيذ الجبس والجبسم بورد.

معلم جبس مكة - خبراء الجبس

نحن متخصصون في تقديم أفضل خدمات الجبس والجبسم بورد في مكة، مع الالتزام بالجودة والاحترافية في كل مشروع نقوم به.

A person is installing white ceramic tiles on a wall, using a spacer to ensure even gaps. The wall has adhesive spread over it in preparation for tiling, with a wooden surface at the bottom edge.
A person is installing white ceramic tiles on a wall, using a spacer to ensure even gaps. The wall has adhesive spread over it in preparation for tiling, with a wooden surface at the bottom edge.

150+

15

عملاء راضون

جودة عالية

خدمات الجبس

نقدم خدمات تركيب الجبس والجبسم بورد بأعلى جودة وبأسعار تنافسية في مكة.

تركيب جبس

نقوم بتركيب الجبس بأشكال متنوعة تناسب جميع الأذواق والمناسبات في مكة.

A partially constructed brick wall with layers of insulation boards attached to it. The insulation boards are marked with the brand 'Kingspan Kooltherm.' The bottom half of the wall is complete, while the top half is still under construction. The ground is covered in debris from the construction process.
A partially constructed brick wall with layers of insulation boards attached to it. The insulation boards are marked with the brand 'Kingspan Kooltherm.' The bottom half of the wall is complete, while the top half is still under construction. The ground is covered in debris from the construction process.
جبسم بورد

نقدم خدمات تركيب جبسم بورد لتزيين المساحات الداخلية بشكل أنيق وعصري.

نحن نستخدم مواد عالية الجودة لضمان أفضل النتائج في جميع أعمالنا.

مواد عالية الجودة
A construction site with an archway framed in DensGlass sheathing panels. There is a large plywood board partially covering the entrance. Construction materials, including a metal container and drywall, are scattered around.
A construction site with an archway framed in DensGlass sheathing panels. There is a large plywood board partially covering the entrance. Construction materials, including a metal container and drywall, are scattered around.
A person is viewed from behind while applying plaster to a wall using a trowel. The individual is wearing a black t-shirt with a logo that reads 'The Street Store'. The wall is partially covered in plaster, revealing a work in progress.
A person is viewed from behind while applying plaster to a wall using a trowel. The individual is wearing a black t-shirt with a logo that reads 'The Street Store'. The wall is partially covered in plaster, revealing a work in progress.
A person is kneeling on the floor in an empty room, placing wooden planks in what seems to be a flooring installation. The room is well-lit by natural light coming through a window. The walls are plain, with a few exposed wires hanging down. There is a bottle placed on the floor, along with several other planks lying around.
A person is kneeling on the floor in an empty room, placing wooden planks in what seems to be a flooring installation. The room is well-lit by natural light coming through a window. The walls are plain, with a few exposed wires hanging down. There is a bottle placed on the floor, along with several other planks lying around.

معرض

استمتع بمشاهدة أعمالنا المميزة في مجال الجبس والجبسم بورد.

An interior wall is covered with a grid of beige tiles. Several electrical conduits run vertically and horizontally across the surface, connecting multiple junction boxes affixed to the wall. One of the boxes is marked with the letter 'N'. The overall appearance is industrial and functional.
An interior wall is covered with a grid of beige tiles. Several electrical conduits run vertically and horizontally across the surface, connecting multiple junction boxes affixed to the wall. One of the boxes is marked with the letter 'N'. The overall appearance is industrial and functional.
The ceiling of a room under construction or renovation, with visible wooden beams and exposed fiberglass insulation. Loose and fluffy pink insulation material is tucked between the beams, with some electrical wires hanging down. The walls are partially uncovered, showing exposed bricks and some unfinished drywall.
The ceiling of a room under construction or renovation, with visible wooden beams and exposed fiberglass insulation. Loose and fluffy pink insulation material is tucked between the beams, with some electrical wires hanging down. The walls are partially uncovered, showing exposed bricks and some unfinished drywall.
Various panels with a grooved pattern arranged in a symmetrical manner. The panels have a textured surface and appear to be made of foam material, commonly used for soundproofing.
Various panels with a grooved pattern arranged in a symmetrical manner. The panels have a textured surface and appear to be made of foam material, commonly used for soundproofing.
A ceiling installation made up of numerous white hangers is seen in a modern interior space. The hangers are artfully arranged to create an intricate pattern. A sign for the MUJI Diner located on the second floor is visible, written in both English and Japanese.
A ceiling installation made up of numerous white hangers is seen in a modern interior space. The hangers are artfully arranged to create an intricate pattern. A sign for the MUJI Diner located on the second floor is visible, written in both English and Japanese.
A plain, light-colored wall with a wooden baseboard near the bottom. The wall has electrical outlets and a light switch. The ceiling features a grid-like pattern with panels.
A plain, light-colored wall with a wooden baseboard near the bottom. The wall has electrical outlets and a light switch. The ceiling features a grid-like pattern with panels.

عمل رائع من معلم جبس مكة، جودة عالية ودقة في التنفيذ. أنصح الجميع بالتعامل معه، لم أندم على اختياري له.

أحمد العتيبي

A person wearing gloves is installing wooden flooring. The focus is on the zigzag pattern of the wood pieces being laid down onto a layer of adhesive.
A person wearing gloves is installing wooden flooring. The focus is on the zigzag pattern of the wood pieces being laid down onto a layer of adhesive.

★★★★★